TB-9-2320-280-35-15

TECHNICAL BULLETIN

INSTALLATION INSTRUCTIONS FOR RETRANSMISSION VEHICLE WITH AMTECH TOP FOR AN/VRC-92F, AN/UYK-128 (V)4, RT-1812, AN/VSQ-2 (V), AB-1386/U, DAGR, AN/PSN-11

SEPTEMBER 2006

  TB-9-2320-280-35-15 - Page 95 of 168

5-71
TB 9-2320-280-35-15
Section XXXII. PLGR BRACKET INSTALLATION
32-1.
Install PLGR bracket (11) on integrated rack (1) with four screws (12).
32-2.
Locate, mark, and drill one 0.201-in. diameter hole (10) in right-side engine tunnel (9).
32-3.
Remove paint from vicinity of hole (4) on integrated rack (1) and hole (10) on right-side engine
tunnel (9). Apply anti-seize compound as required.
32-4.
Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
32-5.
Install ground strap (5) on integrated rack (1) with capscrew (6), three lockwashers (2), and nut (3).
32-6.
Install ground strap (5) on right-side engine tunnel (9) with self-tapping screw (8) and two
lockwashers (7).
Figure 5-84.
2. LOCKWASHER – MS45904-68 – QTY. 3
3. NUT – 9419143 – QTY. 1
5. GROUND STRAP
• BRAIDED WIRE – AA59569F30T0375 – QTY. A/R
• TERMINAL LUG – MS20659-129 – QTY. 2
6. CAPSCREW – B1821BH025C100N – QTY. 1
7. LOCKWASHER – MS35338-43 – QTY. 2
8. SELF-TAPPING SCREW – 9426241 – QTY. 1
11. PLGR BRACKET – 986-0645-001 – QTY. 1
12. SCREW – MS35206-263 – QTY. 4
~
~
1
2
3
5
6
7
8
4
10
9
11
12
2


Back to Top