  TB-9-2320-280-35-15 - Page 94 of 168

5-70
TB 9-2320-280-35-15
Section XXXI. DAGR BRACKET INSTALLATION
31-1.
Install DAGR bracket (11) on integrated rack (1) with three screws (12) and lockwashers (13).
31-2.
Locate, mark, and drill one 0.201-in. diameter hole (10) in right-side engine tunnel (9).
31-3.
Remove paint from vicinity of hole (4) on integrated rack (1) and hole (10) on right-side engine
tunnel (9). Apply anti-seize compound as required.
31-4.
Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
31-5.
Install ground strap (5) on integrated rack (1) with capscrew (6), three lockwashers (2), and nut (3).
31-6.
Install ground strap (5) on right-side engine tunnel (9) with self-tapping screw (8) and two
lockwashers (7).
Figure 5-83.
~
~
1
2
3
4
2
5
6
7
8
9
10
11
12
13