TB-9-3950-253-13-P

PALLETIZED LOAD SYSTEM TRUCK, M1075 and M1075A1 (PLS) AND HEAVY EXPANDED MOBILITY TACTICAL TRUCK, M1120, M1120A2, AND M1120A4 (HEMTT), ENHANCED CONTAINER HANDLING UNIT (E-CHU)

TECHNICAL BULLETIN; OPERATOR AND FIELD MAINTENANCE, INSTALLATION INSTRUCTIONS, AND REPAIR PARTS AND SPECIAL TOOLS LIST

JULY 2009

  TB-9-3950-253-13-P - Page 562 of 704

TB 9-3950-253-13&P
Change 1
0052-52
0052
HOOK ARM SENSOR INSTALLATION – CONTINUED
Stowage Wiring Harness Installation
00052
1. Remove truck wiring harness connector (Figure 51, Item 2) from control box (Figure 51, Item 1).
2. Install stowage wiring harness (
Figure 51
, Item 3) on control box (
Figure 51
, Item 1).
3. Install truck wiring harness connector (
Figure 51
, Item 2) on stowage wiring harness (
Figure 51
, Item 3).
Figure 51.
Stowage Wiring Harness Installation.
052
END OF TASK
467-132
3
1
2
2
1


Back to Top