TM 9-2320-328-13&P-2
0211-2
DRAFT
0211
Change 1
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Connect cab pump control wire harness connector (4) on foam level gauge (2).
2.
Install foam level gauge (2) on pump operator’s panel (3) with four screws (1).
END OF TASK
CALIBRATION
1.
Connect batteries (TM 9-2320-325-14&P).
2.
Push battery disconnect to on position (WP 0007).
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
HWT3492