TM-9-2320-328-13-P-2

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 2 OF 3

MARCH 2009

  TM-9-2320-328-13-P-2 - Page 728 of 1390

TM 9-2320-328-13&P-2
0211-2
DRAFT
0211
Change 1
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Connect cab pump control wire harness connector (4) on foam level gauge (2).
2.
Install foam level gauge (2) on pump operator’s panel (3) with four screws (1).
END OF TASK
CALIBRATION
1.
Connect batteries (TM 9-2320-325-14&P).
2.
Push battery disconnect to on position (WP 0007).
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
HWT3492


Back to Top