TM 9-2320-328-13&P-2
0212-2
DRAFT
0212
Change 1
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Connect pump panel wire harness connector (4) on water level gauge (2).
2.
Install water level gauge (2) on pump operator’s panel (3) with four screws (1).
END OF TASK
CALIBRATION
1.
Connect batteries (TM 9-2320-325-14&P).
2.
Push battery disconnect to on position (WP 0007).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
HWT3497