TM 9-2320-328-13&P-2
0214-2
DRAFT
0214
INSTALLATION
NOTE
All pump operator’s panel indicator lamps are installed the same way.
Foam/flush
indicator lamp shown.
1.
Install indicator lamp (4) in indicator light (3).
2.
Install preformed packing (2) and lamp cover (1) on indicator light (3).
END OF TASK
FOLLOW-ON MAINTENANCE
Close pump operator’s panel (WP 0207)
END OF TASK
END OF WORK PACKAGE
HWT0265