TM 9-2320-328-13&P-2
0212-1
DRAFT
0212
Change 1
FIELD LEVEL MAINTENANCE
PUMP OPERATOR'S PANEL WATER LEVEL GAUGE REPLACEMENT AND CALIBRATION
INITIAL SETUP:
REMOVAL
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Remove four screws (1) and water level gauge (2) from pump operator’s panel (3).
2.
Disconnect pump panel wire harness connector (4) from water level gauge (2).
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
..
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
HWT3497
Tools and Special Tools
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Deleted
References
TM 9-2320-325-14&P
WP 0007
References (Continued)
WP 0015
WP 0391, Fig. 34
Equipment Conditions
Batteries disconnected (TM 9-2320-325-14&P)
Pump operator’s panel opened (WP 0010)