TM-9-2330-342-23-P

PALLETIZED LOAD SYSTEM TRAILER (PLST) M1076 A1

TECHNICAL MANUAL; FIELD MANUAL

OCTOBER 2012

  TM-9-2330-342-23-P - Page 788 of 1348

INSTALLATION - Continued
17.
Pull cable (Figure 17, Item 1) to ensure handle (Figure 17, Item 2) is returned to the locked position.
END OF TASK
FOLLOW-ON MAINTENANCE
Remove wheel chocks (TM 9-2330-342-10). (WP
0190)
END OF TASK
END OF WORK PACKAGE
TM 9-2330-342-23&P
0091
0091-10


Back to Top