TM-9-2815-200-35

ENGINE, WITH CONTAINER:TURBOSUPERCHARGED, DIESEL ,FUEL INJECTION ,90-DEGREE “V” TYPE, AIR - COOLED ,12 - CYLINDER , ASSEMBLY ;MODELS AVDS-1790-2M (2815-856-4996), AVDS-1790-2A AND AVDS-1790-2AM (2815-856-9005)

TECHNICAL MANUAL; DIRECT SUPPORT, GENERAL SUPPORT AND DEPOT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LISTS

  TM-9-2815-200-35 - Page 476 of 779

Disassemble
1. Remove cap screw (A) and lock washer (or assembled
washer bolt).
2. Remove intermediate throttle lever (B) and Woodruff
Remove
1. Remove retaining ring (A).
2. Remove one shock spring spacer (B).
3. Remove shock spring (C).
4. Remove remaining shock spring spacer (D).
5. Remove cap screw (E) and lock washer (or assembled
washer bolt).
6. Remove shock spring control lever (F).
7. Remove Woodruff key (G) from cross shaft.
Install
1. Position Woodruff key (G) in cross sbaft.
2. Position shock spring control lever (F) on cross shaft.
3. Install cap screw (E) and lock washer.
4. Position one shock spring spacer (D) on shaft.
5. Position shock spring (C) on shaft with both ends of
spring engaging straight pin in control lever (F).
6. Position remaining shock spring spacer (B) on shaft
7. Install retaining ring (A).
Figure 6-218. Removing or installing cros s
key from intermediate support shaft
3. Remove two retaining rings (C).
4. Remove intermediate throttle lever support (D) from
intermediate support shaft.
5. Remove two retaining rings (E) and two ball bearings
from lever support.
Assemble
1. Position two ball bearings in intermediate throttle
lever support (D) and install two retaining rings (E).
2. Position lever support (D) on intermediate support
shaft.
3. Install two retaining rings (C).
4. Position Woodruff key and intermediate throttle lever
(B) on intermediate support shaft.
5. Install cap screw (A) and lock washer.
Figure 6-219. Disassembling or assemblin g
intermediate throttle lever support .
shaft shock spring and control lever .
6-182


Back to Top