TM 9-2815-205-34
(9) Install fuel line (50) in elbow (51), at solenoid valve (7), and in elbow (52) on air box heater
body (34). Tighten connections.
(10)
Wind wire wrap (48) around ignition coil
cable (39), air hose (15), and harness
assembly (49). If removed, install clip (38)
on air hose (15).
(11) If removed, install adapter (18) into hose assembly (15). Connect hose assembly to check
valve (16) and adapter end to elbow (17) at air box heater body (34). Tighten connections.
(12) Install connector (19) in solenoid (7) and connector (20) in ignition coil (21).
(13) Install wiring harness lead (28), Iockwasher (24), and nut (22) on terminal (26). Install lead (29),
Iockwasher (25), and nut (23) on terminal (29) on air pump (30). Tighten nuts securely.
(14) Install ground wires (33), copper washer (32), and bolt (31) on air box heater body (34). Torque
bolt to 13-17 Ib-ft (18-23 N-m).
(15) Install clip (38), on air hose (15), flat washer (37), Iockwasher (36), and screw (35) on upper
front cover. Torque screw to 30-35 Ib-ft (41-47 N
.
m).
(16) Connect boot end of ignition coil cable (39) to igniter (40) and connector end of ignition coil
cable to ignition coil (21).
(17) Install screw (43), flat washer (44), Iockwasher (42), and nut (41) in bracket (46) and support
(47). Torque nut to 30-35 Ib-ft (41-47 N
.
m).
3-29