TM 9–1200–215–34&P
2–39
2–21.
SERIAL I/O PORT CABLE, VGA CABLE, SCSI RIBBON CABLE MAINTENANCE
INSTRUCTIONS CONTINUED
b.
INSTALLATION CONTINUED
NOTE
Hardware attaching retaining strap
to ACU may be securing more than
one retaining strap.
Upon
installation of applicable retaining
strap, ensure that all straps secured
with same hardware are installed.
6.
If removed, attach retaining straps (21, 22, and
23) to ACU by inserting screw (18), new
lockwasher (19), and flat washer (20) or attach
retaining straps (29 and 30) by inserting screw
(26), new lockwasher (27), and flat washer
(28).
7.
Install cap (24) onto Serial I/O Port cable
connector and cap (25) onto VGA cable
connector.
8.
Install cap (31) onto SCSI cable connector.
9.
Connect ribbon cable (10, 11, or 16) to CPU
CCA (17).
10. If SCSI cable was removed, install insulating
block (12) by inserting three screws (13), three
new lockwashers (14), and three flat washers
(15).
11.
If Serial I/O or VGA cable was removed, install
insulating block (6) by inserting three screws
(7), three new lockwashers (8), and three flat
washers (9).
CAUTION
The EMI shielding gasket is vital to
this piece of equipment and is easily
damaged.
Handle with care when
removing or replacing it.
Failure to
comply may result in damage to
equipment.
12. If removed, install EMI shielding gasket (4) in
groove in housing (5).
13.
Position connector panel (1) on housing and
align holes.
14. Install 16 screws (2) and 16 flat washers (3).
Following torque sequence chart, torque
screws to 30 in.–lb (3.4 N
S
m).
15. Install top panel in accordance with procedure
outlined in paragraph 2–13.
10
16
31
1
5
8
12
4
15
9
13
1
7
14
2
6
1
2
3
6
9
8
7
10
5
11
17
13
14
15
12
16
4
24
21
22
18
19
20
23
27
28
30
25
26
29
31