TM 9–1200–215–34&P
2–40
2–22.
ETHERNET CABLE AND 1553 (CHANNEL B) CABLE MAINTENANCE
INSTRUCTIONS
DESCRIPTION
This task covers:
a.
Removal
b.
Installation
INITIAL SETUP
Tools:
Tool Kits, JTK–17LAL, TK–101/G, or TK–105/G
(items 34, 35, & 36, Appendix E)
Torque Wrench, 0–75 in.–lb (item 40, Appendix E)
Materials/Parts:
Lockwasher (item 8, Appendix F)
Personnel Required:
One MOS 35Y
a.
REMOVAL
CAUTION
ESD SENSITIVE
The ACU contains ESD sensitive
components. Wear a protective
ESD wrist strap whenever handling
components. Failure to comply may
result in damage to equipment.
1.
Attach ESD grounding strap to wrist and
ground to ensure ESD protection.
CAUTION
The connector panel assembly is
attached by cables to internal
components of ACU and cannot be
moved very far from housing without
putting strain on those cables.
Exercise caution when removing
bottom cover from ACU housing.
Failure to comply may result in
damage to equipment.