TM 9–1200–215–34&P
2–37
2–21.
SERIAL I/O PORT CABLE, VGA CABLE, SCSI RIBBON CABLE MAINTENANCE
INSTRUCTIONS CONTINUED
a.
REMOVAL CONTINUED
2.
Remove ACU connector panel (1) by removing
16 screws (2) and 16 flat washers (3).
Lift
connector panel off housing.
CAUTION
The EMI shielding gasket is vital to
this piece of equipment and is easily
damaged.
Handle with care when
removing or replacing it.
Failure to
comply may result in damage to
equipment.
3.
Inspect EMI shielding gasket (4) in groove in
housing (5) for cuts, nicks, or signs of
stretching.
Discard EMI shielding gasket if
unserviceable.
4.
Remove insulating block (6) by removing three
screws (7), three lockwashers (8), and three
flat washers (9) if the Serial I/O Port Cable
(10) or VGA Cable (11) is being removed.
Discard lockwashers.
5.
Remove insulating block (12) by removing
three screws (13), three lockwashers (14), and
three flat washers (15) if the SCSI Cable (16)
is being removed.
NOTE
•
The removal of the Serial I/O Port,
VGA and SCSI cable connectors is
performed in the same manner.
•
When removing the SCSI cable
connector, disconnect the SCSI
cable from the TCIM CCA as well as
from the CPU CCA.
6.
Disconnect ribbon cable (10, 11, or 16) from
back of CPU CCA (17).
7.
If necessary to replace Serial I/O or VGA
connector cap and strap, remove screw (18),
lockwasher (19), and flat washer (20) securing
retaining straps (21, 22, and 23) to ACU.
Discard lockwasher.
8.
Remove connector cap (24 or 25).
9.
If necessary to replace SCSI connector cap
and strap, remove screw (26), lockwasher
(27), and flat washer (28) securing straps (29
and 30) to ACU. Discard lockwasher.
1
2
3
6
9
8
7
10
5
11
17
13
14
15
12
16
4
24
21
22
18
19
20
23
27
28
30
25
26
29