TM-9-2350-260-20-1-3

TANK, COMBAT, FULL TRACKED 105-MM GUN, M60 2350-00-678-5773 (HULL)

TECHNICAL MANUAL; ORGANIZATIONAL MAINTENANCE VOLUME 3 OF 4 CHAPTERS 10 THRU 15

  TM-9-2350-260-20-1-3 - Page 482 of 783

TM 9-2350-260-20-1-3
SHIFTING CONTROL BRACKET AND CONNECTING LINK ASSEMBLY REPAIR
(Sheet 8 of 9)
9.
Position stud and rod end bearing assembly (L) with
rod end holes alined with holes in clevises (M) and
(N).
10. Using 9/16 inch socket, install two bolts (P) through
devises (M) and (N) and stud and rod end bearing
assembly (L).
11. Using torque wrench and 9/16 inch socket, tighten
two bolts (P) to 190-200 lb-in (22-23 N
m).
INSTALLATION:
1.
Position bracket assembly (A) and shield (B) against
hull wall with mounting holes alined.
2.
Using 9/16 inch socket and 9/16 inch wrench, install
three lockwashers C) and screws (D) through
bracket (A).
3.
Using torque wrench, extension, and 9/16 inch
socket, tighten three screws (D) to 190-200 lb-in (22-
23 N
m).
4.
Position rod end (E) in clevis (F).
5.
Using 9/16 inch wrench, install bolt (G) through
clevis (F) and rod end (E).
6.
Using torque wrench and 9/16 inch socket, tighten
bolt (G) to 190-200 lb-in (22-23 (N
m).
Go on to Sheet 9
TA146605
11-51


Back to Top