TM-9-2320-283-13-P

ANTI-LOCK BRAKE SYSTEM (ABS) M915A1

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

AUGUST 2012

  TM-9-2320-283-13-P - Page 132 of 400

0018-30
TM 9-2320-283-13&P
0018
1
2 (PHPFT-10BGRN100)
3
4
1 (PH207ACBH-8)
2
*
3 (54X8X8)
4
*
5
2
IINSTALLATION OF ABS AIR LINES – CONTINUED
4.
Cut new 5/8 in. (16 mm) green tube (figure 46, item 2), to 45 in. (114 cm) in length, connect tube
(figure 46, item 2) to elbow (figure 46, item 1), and route opposite end of tube (figure 46, item 2)
through crossmember opening at left frame rail to left-rear modulator (figure 45, item 3).
5.
Connect tube (figure 46, item 2) to adapter (figure 46, item 4) on left-rear modulator (figure 46, item 3).
Figure 46. Connecting Tube to Relay Valve and Left-Rear Modulator.
NOTE
Mark new bulkhead fitting mounts RF, RR, LF, and LR for right and
left and front and rear identification during ABS installation.
6.
Install new bulkhead fitting (figure 47, item 1) on new right-rear bulkhead fitting mount
(figure 47, item 5) with new lockwasher (figure 47, item 2) and new nut (figure 46, item 4) supplied
with the new bulkhead fitting (figure 47, item 1).
7.
Install new elbow (figure 47, item 3) on bulkhead fitting (figure 47, item 1) as shown in figure 47.
*
ITEM 2 SUPPLIED WITH ITEM 1
*
ITEM 4 SUPPLIED WITH ITEM 1
Figure 47. Assembling Right-Rear Bulkhead.


Back to Top