TM-9-2320-283-13-P

ANTI-LOCK BRAKE SYSTEM (ABS) M915A1

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

AUGUST 2012

  TM-9-2320-283-13-P - Page 133 of 400

0018-31
TM 9-2320-283-13&P
0018
1
2 (W323102)
3
4
5 (W323102)
6 (001-020-19-37)
*
(001-020-19-36)
*
7
8 (W1468X10)
9
10 (PHPFT-10BGRN100)
11
INSTALLATION OF ABS AIR LINES – CONTINUED
NOTE
Bolts removed from leaf spring shackles are reused to mount
bulkhead fitting mounts. A total of six bolts are reused in three
locations.
8.
Install right-rear bulkhead fitting mount (figure 48, item 6) on right frame rail (figure 48, item 3) and rear
alignment clip (figure 48, item 3) with bolt (figure 48, item 9) and new locknut (figure 48, item 5).
9.
Install bolt (figure 48, item 4) and new locknut (figure 48, item 2) on right frame rail (figure 48, item 3)
and rear alignment clip (figure 48, item 3).
10.
Install new adapter (figure 48, item 8) on bulkhead fitting (figure 48, item 7), and cut and install 12 in.
(30 cm) piece of 5/8 in. (16 mm) green tubing (figure 48, item 10) on adapters (figure 48, items 1 and 8)
between right-rear bulkhead (figure 48, item 7) and modulator (figure 48, item 11).
11.
Perform steps 6 through 10 for installation of new left-rear bulkhead fitting mount on left frame rail.
*
P/N 001-020-19-37 IS USED FOR RIGHT-REAR MOUNT
*
P/N 001-020-19-36 IS USED FOR LEFT-REAR MOUNT
Figure 48. Installing Right-Rear Bulkhead.


Back to Top