TM-9-2320-283-13-P

ANTI-LOCK BRAKE SYSTEM (ABS) M915A1

TECHNICAL MANUAL; OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

AUGUST 2012

  TM-9-2320-283-13-P - Page 134 of 400

0018-32
TM 9-2320-283-13&P
0018
1
2
3 (PHPFT-10BGRN100)
4 (W1468x10)
5 (PH207ACBH-8)
6
7 (001-020-19-36)
8
*
9
*
10 (54X8X8)
12
11 (RUBBER AIR HOSE)
13
14 (W323102)
15 (W323102)
INSTALLATION OF ABS AIR LINES – CONTINUED
12.
Install new right-front bulkhead fitting mount (figure 49, item 7) on right frame rail and forward leaf
spring shackle (figure 49, item 1) with bolt (figure 49, item 6) and new locknut (figure 49, item 14).
13.
Install bolt (figure 49, item 2) and new locknut (figure 49, item 15) on right frame rail and forward leaf
spring shackle (figure 49, item 1).
14.
Install new bulkhead fitting (figure 49, item 5) on right-front bulkhead fitting mount (figure 49, item 7)
with new lockwasher (figure 49, item 8) and new nut (figure 49, item 9).
15.
Install new adapter (figure 49, item 4) and new elbow (figure 49, item 10) on bulkhead fitting
(figure 49, item 5).
16.
Remove and discard existing tube and fitting from spring brake chamber (figure 49, item 13), and install
new elbow (figure 49, item 12) and new hose assembly (figure 49, item 11) on spring brake chamber
(figure 49, item 13) as shown.
17.
Connect opposite end of hose assembly (figure 49, item 11) to elbow (figure 49, item 10) on right-front
bulkhead (figure 49, item 5).
18.
Cut and route new 48 in. (122 cm) piece of 5/8 in. (16 mm) green tubing (figure 49, item 3) between
right-front bulkhead and right-rear modulator, and connect tube (figure 49, item 3) to adapter
(figure 49, item 4).
*
ITEM 8 SUPPLIED WITH ITEM 5
*
ITEM 9 SUPPLIED WITH ITEM 5
Figure 49. Installing Left-Forward Bulkhead.


Back to Top